Façade installations are among the highest-risk operations on any UK construction project. We bring installation-grade expertise to every sequence, every interface, every lift — and to the post-Grenfell cladding remediation programme that's transforming UK high-rise stock.
Pre-install planning, interface coordination, live install supervision, sign-off discipline. Installation knowledge applied — not theoretical advisory.
The sequence decides the programme. We design the install sequence with the structure, M&E and follow-on trades — and pre-sign the lift plan with the Appointed Person.
Most rework comes from interface neglect. We hold the interface — between SFS, slab edge, M&E penetrations and follow-on internal trades — as its own live discipline.
Installation runs to the inch. Daily QA inspections, signed ITPs, defect prevention at point of install — not retrospective punch lists.
Defect closure follows installation by 7 days max. The handover punch list is ≤ 5% of typical because the closure is continuous.
The Building Safety Act 2022 has set off the largest façade remediation programme in UK history. £15 billion of cladding works across 6,000+ high-risk buildings. We've spent twenty-five years installing the systems that now need replacing — which is why we know exactly how to strip them safely and reskin to the new regulatory standard.
Safe strip-out of ACM, HPL, PIR/PUR insulation and non-compliant systems. Lift plans approved by Appointed Person. Live-building working with resident liaison protocols.
A1/A2-rated cladding systems, fire-tested assemblies, PAS 9980 compliance evidence pack, BSA 2022 duty-holder responsibilities documented. Certified — not patched.
Same unitised system. Same building. One install run with embedded façade oversight, one without. The difference shows up in rework, defects and PC date.
From design review through final sign-off. Engagement typically begins at design freeze and runs to retention release.
Façade design reviewed for constructability. Sequence designed around structure handover. Lift plan drafted with Appointed Person. Site logistics assessed.
RAMS, method statements & permit-to-work systems live. Site team briefed on sequence, interfaces & sign-off discipline. Daily QA template deployed.
On-site daily supervision through install. Daily QA inspections logged. Defect close-out within 7 days. Live clash log maintained with all trades.
QA audit closed. Final defect list resolved. Completion sign-off issued. Handover documentation pack delivered. Retention defended through defects period.
Sequencing decisions made at tender — or at mobilisation — never get unmade cheaply. Bring us in before the lift plan is drafted.