Commercial &
Contract Management.

We protect your commercial position from tender to final account. Every variation captured. Every notice served. Every payment application bulletproof.

Key outcome Every pound you've earned is documented, notified, and recoverable.
Typical value protected
£200K – £2M
Per project · variations + LADs avoided + final account uplift.
Engagement model
Embedded
From day one of mobilisation. Site cabin presence + remote.
Lead chartered partner
MRICS
20+ years UK façade & specialist subcontract commercial.
Reporting cadence
Daily · Monthly
Daily site report by 18:00 · monthly board dashboard.

What we run across the lifecycle.

Twelve disciplines, grouped into four clusters: pre-contract, live administration, payment defence, and final account. Each cluster delivered by chartered RICS personnel.

CLUSTER · 01 Pre-contract

Bid-stage protection & contract negotiation.

Catch the unenforceable clause before it's signed. Most commercial damage on a UK subcontract happens in the seven days before the contract is executed — not the 24 months after.

  • Tender review & bid-stage risk analysisPRE · 01
  • Subcontract review & back-to-back analysisPRE · 02
  • Bid-stage contract review & red-flag reportPRE · 03
  • Cost planning & value engineeringPRE · 04
  • Procurement strategyPRE · 05
CLUSTER · 02 Live administration

Variation discipline & notice tracking.

Variations are won or lost in the first 72 hours after the instruction. We capture, value, and serve the notice within the contract window — every time.

  • Variation account managementLIVE · 01
  • JCT / bespoke contract administrationLIVE · 02
  • Early Warning Notice drafting & trackerLIVE · 03
  • Dayworks records & substantiationLIVE · 04
  • Benchmarking & cost reportingLIVE · 05
CLUSTER · 03 Payment defence

HGCRA compliance & cash flow protection.

The Housing Grants Construction and Regeneration Act gives you statutory payment rights. Most subcontractors don't enforce them. We run the notice regime as your shadow.

  • Interim application preparation & supportPAY · 01
  • Payment notice & pay-less notice monitoringPAY · 02
  • Smash & grab claim preparation (where required)PAY · 03
CLUSTER · 04 Final account

Final account strategy & retention release.

The final account is settled at the rate your records support. We arrive at month one with the substantiation already in place — not month 26 hoping to reconstruct it.

  • Final account strategy & negotiationFA · 01
  • Scott Schedule preparation (dispute-ready)FA · 02
  • Retention release strategyFA · 03

Two projects. One difference.

Same package, same value, same main contractor. One running with embedded commercial protection from day one, one without. The financial gap at final account is consistently in the £200K – £500K range.

Without protection

Variations rejected. EOTs late. Final account light.

Variations rejected — "insufficient contemporary records" cited as default
EWN windows missed — Relevant Events recharacterised as subcontractor delay
LADs applied with no carve-out, no mitigation, no challenge
Pay-less notices accepted without HGCRA compliance check
Final account settles at 60–70% of substantiated value
Retention withheld pending unresolved snagging disputes
33%
Typical variation recovery rate
With Ashton Blake

Every variation captured. Every notice on time.

Every variation captured contemporaneously — valued, substantiated, served
EWNs drafted within 24 hours of trigger event — never time-barred
LADs carved out for MC-caused delay — entitlement claimed and granted
Pay-less notices challenged within 7 days when non-compliant with HGCRA
Final account submitted at 95–105% of contract value, supported
Scott Schedule pre-prepared as adjudication-ready fallback
95%
Recovery rate · this discipline

Four-step commercial protection deployment.

From your first call to your first month of operation. We can compress to two weeks for emergency intervention; standard mobilisation is three weeks.

01
Week 1 · Audit

Contract & project audit.

We review the executed subcontract, the current programme baseline, the existing records (or lack thereof), and any live variation/notice positions. Output is a written red-flag report — what's safe, what's exposed, what needs immediate action.

Delivered
Red-flag audit report
Risk register · prioritised
90-day action plan
02
Week 2 · Systems

Records system deployment.

We deploy the daily site report template, the photographic protocol, the EWN tracker, the variation register, the document-control flow. We train your site team — typically one PM, two engineers, one document controller — on capture discipline before the next reporting day begins.

Delivered
Daily site report template
EWN tracker (live)
Variation register (live)
Site team training session
03
Week 3 onward · Operate

Live commercial administration.

Daily review of site report by 18:00. Notice drafting within 24 hours of trigger events. Variation valuation in parallel with capture. Monthly interim application preparation. Weekly progress meeting attendance. Adjudication-ready records logged throughout.

Delivered
Live notices & variations
Weekly progress reports
Monthly board dashboard
04
Month 24+ · Close-out

Final account & retention release.

Final account submission package — full evidence library, variation valuations, notice trail, programme analysis, retention application. Scott Schedule prepared in parallel and held ready. Negotiation lead with main contractor's QS or commercial director until settlement.

Delivered
Final account submission
Scott Schedule (standby)
Settlement & retention
Free · 15 minutes · No obligation · Senior partner only

Bring us in before the next contract is signed.

Contract and programme review with a chartered partner. We tell you what we'd do differently — whether you hire us or not. Specifically for your live commercial position.

Response timeSame working day
Partner levelMRICS chartered
ConfidentialityNDA on request
CoverageUK · Europe · MENA · CIS