Built for façade contractors — by people who've installed the systems.

Unitised curtain wall, stick systems, rainscreen, SFS substructure — plus the post-Grenfell cladding remediation programme. We've installed every system we now protect — £20M+ packages on tier-1 Central London projects.

Sector outcome Façade-grade expertise. Cladding remediation specialists.
Typical package value
£5M – £40M
Bid-stage to retention release · 18–36 month programmes.
Lead chartered partner
Chartered partner · AP
MCIOB · Appointed Person · 25+ yrs high-risk façade.
Fire compliance
PAS 9980 · BS 8414
BSA 2022 duty-holder ready · HRB-aligned.
Programme criticality
Critical path
Façade slip = follow-on trade slip. We defend it.

The risks that cost façade contractors hundreds of thousands.

Six risks specific to UK façade subcontracts. Every one is recoverable with records discipline from day one — and time-barred without it.

RISK · 01

Structure–façade interface delays

Slab edge tolerance creep drives weeks of rework on the SFS substructure or bracketry. EWN required within days of trigger.

Typical exposure£100K+ / cycle
RISK · 02

Late design freeze

Architectural changes after factory production trigger variation cascades. Each cycle commonly worth £100K+ if recorded; £0 if not.

Typical exposure£100K+ / change
RISK · 03

Cladding compliance · BSA 2022

PAS 9980 risk assessment, BS 8414 evidence pack, HRB duty-holder requirements. Non-compliance = remediation order.

Typical exposureExistential
RISK · 04

Lifting access constraints

Crane shutdowns on urban sites cost £10K+/day. Lift plans must be Appointed Person signed under LOLER and BS 7121.

Typical exposure£10K+ / day lost
RISK · 05

Variation rejection

Bespoke detail variations — bracketry, glazing reconfiguration, sealant changes — often rejected by main contractor without contemporaneous records.

Typical exposure£200K+ at FA
RISK · 06

Programme position

Façade is critical path on most commercial towers. Every day of delay impacts mechanical, electrical and fit-out — and lands at your door.

Typical exposureLADs apply

The services façade contractors use most.

Façade engagement typically combines installation oversight with commercial protection from day one. Programme defence and CDM are non-negotiable.

Free · 15 minutes · No obligation · Senior partner only

Bring us in before the bid is signed.

On façade packages the £200K–£500K of value gets locked or lost in the seven days before signature. Tender review is where the biggest returns sit.